4 Results for "waste"

4 results displayed (1 - 4):

MRF Exterior

Transfer Station Expansion (from original 2007-2011 build), New MRF Enclosure, C&D Enclosure and Site Improvements.Pre-Engineered Metal Building. ...

Waste and Refuse Facility

Over 55,000 square foot of transfer station/material recovery facility. ...

Waste and Refuse Campus

Expansion and enclosure of three buildings from an original build in 2008 at a large and active Waste and Refuse facility. ...

Gardena Transfer Station

Re-roof and enclosure at an active Transfer Station building at a Waste and Refuse facility. ...