7 Results for "Erection"
7 results displayed (1 - 7):
Erecting Steel Building
The erection crew is making progress on the discount store in Highland. The men erecting the steel building are using boom and scissor lifts to create the roof structure. ...
Steel Building Erector
The Facility Builders steel building erectors assembles a steel building with clear spans for an 80-ton overhead crane runway. Pre engineered steel buildings allow for the large spans that are required for industrial buildings. ...
Church Metal Building
FB&E completes the standing seam roof system over the upper gymnasium. The church metal building frame is erected and ready for the next phase. ...
Multi-Purpose Facility Exterior
A pre-engineered metal building exterior of a 13,265 square foot gymnasium, erected with a 2,550 square foot second story mezzanine. ...
Aerospace Manufacturing Facility Erection
The 38,000 square foot pre-engineered aerospace manufacturing facility includes: site paving, mezzanine, equipment foundation, utilities, and cranes. ...
Pre-Engineered Metal Fuel Island
The pre-engineered metal fuel island with canopy is equipped with an electronic card reader. The fuel island has a 10,000 gallon capacity. ...
Pre-Engineered Building Erection
The pre-engineered metal material recovery facility is being erected by Facility Builders and Erectors employees during the winter. Facility Builders has experience with pre engineered building erection similar to the MRF. ...