13 Results for "Steel Building"

13 results displayed (1 - 13):

Transfer Station T.I.

Re-roof and enclosure at an active Transfer Station building at a Waste and Refuse facility. ...

Van Nuys Hangar

Erection of two Pre-Engineered Metal Building Airplane Hangars for a local Airport. ...

LA County Substation Interior

Provided structural engineering, civil design, electrical design, mechanical and plumbing design services to a new 14,270 sf single story, 24ft. masonry Substation built to accomodate anticipated mass growth. ...

Concert Hall PEMB

Concert Hall in a remote community in Southern California. Facility Builders worked closely with the owners, architect and acoustical engineers to design this custom PEMB structure. ...

Concert Hall Exterior

Concert Hall Exterior in a remote community in Southern California. Facility Builders worked closely with the owners, architect and acoustical engineers to design this custom PEMB structure. ...

Concert Hall Interior

Concert Hall Interior in a remote community in Southern California. Facility Builders worked closely with the owners, architect and acoustical engineers to design this custom PEMB structure. ...

Airplane Hangar Front

A 28,000 sf. pre-engineered hangar building, which FB&E's erection crews handled the steel erection, roof & wall sheeting and insulation systems, and the assembly and install of the DPI hangar doors. ...

Commercial Steel Building

The Facility Builders crew is working to assemble the pre-engineered metal building for commercial use. ...

Erecting Steel Building

The erection crew is making progress on the discount store in Highland. The men erecting the steel building are using boom and scissor lifts to create the roof structure. ...

Custom Metal Building

The custom metal building manufacture facility features clean environments, interior mezzanine, overhead crane, and airlock for moving parts. ...

Pre Fab Metal Building

The pre fab metal building exhibits a customized eave canopy. Facility Builders & Erectors installs the steel pieces for the church. ...

Aerospace Manufacturing Facility Erection

The 38,000 square foot pre-engineered aerospace manufacturing facility includes: site paving, mezzanine, equipment foundation, utilities, and cranes. ...

Roof Panel Installation

FBE erectors installing 8 inch thick 40 foot long insulated roof panels on a state of the art aerospace manufacturing facility. ...